ID · ID-55
Driving to Tamarack
This is a road-access page, not a resort snow report. Confirm lift and terrain operations with the resort.
Status unclear
SH-21
Bridge construction on SH-21 Both Directions near South Fork Payette River. Lanes Alternating. 4/29/2025 7:00 AM to 6/30/2027 8:00 PM Mon, Tue, Wed, Thu, Fri, Sat, Sun: 7:00 AM - 8:00 PM Width Restriction: 13ft Weight Restriction: 80000lbs Speed Restriction: 25mph Activities: expect delays, reduced to single lane, alternating direction of travel. Expect Delays: Under 15 minutes · alternating-one-way · reduced-width: 13 feet · reduced-weight: 80000 pounds
Pipeline observation: Jul 30, 2026, 8:00 PM UTC · Agency update: Nov 26, 2025, 2:09 PM UTC
Route and snow context
Confirm with ID DOT Resort conditions
NOHRSC is gridded analysis; SNOTEL is a nearby station; NWS grid forecasts are not road-surface forecasts. Signs and closures are authoritative.