Pass Conditions

ID · US-93 · 7,160 ft

Willow Creek Summit conditions

Open / no control detected

US-93

Road construction on US-93 Both Directions from 3250 N to E 3800 N. 6/2/2026 6:00 AM to 10/2/2026 12:00 AM Mon, Tue, Wed, Thu, Fri, Sat, Sun: Active all day Width Restriction: 11ft Activities: Look Out for Flagger, Pilot Car in Operation, Repairs in Progress, Use Caution. · all-lanes-open · reduced-width: 11 feet

Observed by this pipeline:Jul 30, 2026, 7:50 PM UTC · Agency update:Jun 12, 2026, 10:44 PM UTC

Confirm with ID DOT

Coverage statement:Public Idaho WZDx work-zone and lane-impact events, polled every 10 minutes.The public WZDx feed is not Idaho's full mountain-pass or chain-control feed. Use Idaho 511 for winter restrictions.

Snow and forecast context

Not availableNOHRSC estimated snowfall · 24h
Not availableNOHRSC estimated snowfall · 72h
Not availableNOHRSC season accumulation
Not availablenearest SNOTEL snow depth
Not availableNWS-grid snowfall forecast · next 72h

Forecast not available from the latest pipeline run.

Cameras, roadside weather and snowplows

Coverage statement: Camera images and RWIS readings are not republished in this launch dataset. Use the official DOT link for the current camera and road-weather view.

Save an alert window for Willow Creek Summit

Every request expires. Choose a trip window of up to 14 days or a season pass that ends April 30. There is no forever option.

Alert window

Capture is live. Confirmation and transition delivery are not promised until the confirmation email arrives. Unsubscribe is available on every future send.

Nearby live road records

Road point or segmentStatusAgency updateOfficial
US-93
US-93
Open / no control detected
Road construction on US-93 Both Directions from 3250 N to E 3800 N. 6/2/2026 6:00 AM to 10/2/2026 12:00 AM Mon, Tue, Wed, Thu, Fri, Sat, Sun: Active all day Width Restriction: 11ft Activities: Look Out for Flagger, Pilot Car in Operation, Repairs in Progress, Use Caution. · all-lanes-open · reduced-width: 11 feet
Jun 12, 2026, 10:44 PM UTC
looked Jul 30, 2026, 7:50 PM UTC
DOT
US-93
US-93
Open / no control detected
Road construction on US-93 Both Directions from 3250 N to E 3800 N. 6/2/2026 6:00 AM to 10/2/2026 12:00 AM Mon, Tue, Wed, Thu, Fri, Sat, Sun: Active all day Width Restriction: 11ft Activities: Look Out for Flagger, Pilot Car in Operation, Repairs in Progress, Use Caution. · all-lanes-open · reduced-width: 11 feet
Jun 12, 2026, 10:44 PM UTC
looked Jul 30, 2026, 7:50 PM UTC
DOT
US-93
US-93
Open / no control detected
Utility work on US-93 Northbound from Bridgeview Blvd to Snake River. 7/27/2026 7:00 AM to 9/4/2026 5:00 PM Mon, Tue, Wed, Thu, Fri, Sat, Sun: Active all day Activities: Use Caution. · all-lanes-open
Jul 17, 2026, 10:45 PM UTC
looked Jul 30, 2026, 7:50 PM UTC
DOT

Snow history near Willow Creek Summit

Historical station backfill has not reached this pass yet.

Recent status transitions

No status transition has been archived for the matched road records yet.

NOHRSC snowfall is a roughly 4 km analysis, not a road-surface observation. SNOTEL and GHCN stations can differ materially in distance and elevation. Always use the DOT link for the travel decision.